RENOVATIONS--DECEMBER
The first pictures up are from 12/6/08, with the windows going in, work on the driveway and the septic system, the roof just about done, and the hole in the living room floor for the fireplace. Oh, and the last photo won't rotate--sorry!! It should be vertical, not horizontal!
Scroll down to find more December pics through 12/14/08.
And scroll further down to find pics through 1/18/09--Sheila got in a few in the new dog yard. The workshop is now on....uh, over...its foundation, some insulation is in, interior walls are framed and with wiring and plumbing, and we're awaiting the installation of the heating system, which is all here.
|
Pictures through December 14, 2008......all windows in, a start of interior walls, painted siding, the "workshop" and septic system get started.
|
Photos through January 18, 2009. First pictures were taken the end of December, after we had snow, then a melt. Now we're back to snow scenes!
|
|